Quick answer
After Exterior, spot-check the output, then decide whether to delete/archive the original; keep a backup. Exterior depends on height/equipment/weather/safety.
Why it matters
A backup lets you roll back if the output is wrong.
Height.
Step by step
- Count windows/sides/height/screens/tracks/hard water.
- Separate glass/screens/tracks/high areas/solar panels.
- Get 2-3 quotes; confirm scope/visits/insurance.
- Contract states frequency/damage/cancellation/payment.
Common mistakes
- Total price only, not window count/sides.
- Ignoring screens/tracks/hard water.
- High-rise without insurance/credentials.
- No damage/cancellation terms.
Checklist
- Count/sides/height/screens/tracks.
- Glass/screens/tracks/high/solar.
- Insurance/credentials/equipment/safety.
- Frequency/contract/cancellation/payment.
- Hard water/damage/warranty.
Key facts
- Height.
- Equipment.
- Safety.
FAQ
What should I do after Exterior?
After Exterior, spot-check the output, then decide whether to delete/archive the original; keep a backup. Exterior depends on height/equipment/weather/safety.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: OSHA