Quick answer
For Cost factors, follow a checklist: backup, format, size/quality, output, spot-check. Count/sides/height/screens/tracks drive total.
Why it matters
A fixed checklist prevents skipping the critical step.
Count.
Step by step
- Count windows/sides/height/screens/tracks/hard water.
- Separate glass/screens/tracks/high areas/solar panels.
- Get 2-3 quotes; confirm scope/visits/insurance.
- Contract states frequency/damage/cancellation/payment.
Common mistakes
- Total price only, not window count/sides.
- Ignoring screens/tracks/hard water.
- High-rise without insurance/credentials.
- No damage/cancellation terms.
Checklist
- Count/sides/height/screens/tracks.
- Glass/screens/tracks/high/solar.
- Insurance/credentials/equipment/safety.
- Frequency/contract/cancellation/payment.
- Hard water/damage/warranty.
Key facts
- Count.
- Height.
- Tracks.
FAQ
What is a Cost factors checklist?
For Cost factors, follow a checklist: backup, format, size/quality, output, spot-check. Count/sides/height/screens/tracks drive total.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: OSHA